Southwest Pipeline 3-1E near Beulah, ND

After installing a 2,550 foot bore in the Missouri River, our deep water diving team anchored the diffusion pipe to the river floor.  This also included installation of 15 miles of 10 inch through 8 inch PVC pipe from the existing water treatment plant.